The EcoTech Vectra series (S2, M2, L2) is a leading choice for reef return and closed-loop systems. Here’s how to install and configure your pump for peak performance.
Step-by-Step Installation
-
Unbox & Inspect – Confirm all parts, including QuietDrive controller, unions, and brackets.
-
Position Pump in Sump – Use silicone feet to reduce vibration.
-
Attach Plumbing – Use metric or standard adapters; avoid overtightening.
-
Check for Leaks – Prime lines and inspect seals before powering on.
Mobius App Connection
-
Power On Pump
-
Open Mobius App → Add Device
-
Select Vectra and follow Bluetooth pairing steps
-
Name your pump and assign flow direction (return or closed loop)
Calibrate Flow & Use Feed Mode
-
Use Flow Calibration Tool to set max flow.
-
Enable Feed Mode to pause flow during feeding (custom duration).
-
Use Schedules for automatic speed changes throughout the day.